JW Marriot San Antonio Hill Country Resort and Spa

Client: Ella S.A. Contracting, L.P.

Description

This enchanting resort and spa is located in the beautiful Texas Hill Country. It is 1.16 million sq. ft. which encompasses 1,002 rooms; 265,000 sq. ft. of customizable meeting and event space; 26,000 sq. ft. of spa luxury; a 650 ft. rapid river ride; and 1,100 ft. long lazy river. The resort is not complete without a 42,000 sq. ft. PGA golf club house and two, 18-hole PGA golf courses.UNINTECH’s infrastructure work encompassed storm drains; retention ponds; sewer, electrical and communication lines for roads, parking lot and two golf courses. Our survey team has also provided construction staking and underground utilities, concrete flat work.The resort received a LEED Certification from the U.S. Green Building Council.

Services Provided

Surveying

Construction Surveying

 

 

See More of Our Work

  • Seeling Channel Phase III

    The purpose of the Seeling Channel Phase III project, one of the largest projects from the 2017-2022 City of San Antonio Bond, was to widen and deepen Seeling Channel from St. Cloud to Morning Glory.

  • Engineering San Antonio

    Fire Station No. 50

    The design and construction of a new 11,600 sq.ft. fire station with LEED Silver Certification.

  • Engineering San Antonio

    Structural Municipal Projects

    UNINTECH provided professional structural engineering services for various municipal projects for the City of McAllen. We received work orders on these projects.

  • Engineering San Antonio

    Texas A&M University – San Antonio

    This is the new campus for Texas A&M System for Texas A&M University-San Antonio. The campus is located south of Southwest Loop 410 between Zarzamora and Pleasanton roads.

  • Engineering San Antonio

    Old Highway 20 Bridge 155

    UNINTECH was the prime consultant for this project, which purpose was to improve the existing Bridge 155. The existing one-lane bridge structure spans Gilleland Creek Tributary with an overall bridge length of 140 ft., was replaced to a new two-lane bridge.