Old Highway 20 Bridge 155

Client:  Travis County

Description

UNINTECH was the prime consultant for this project, which purpose was to improve the existing Bridge 155. The existing one-lane bridge structure spans Gilleland Creek Tributary with an overall bridge length of 140 ft., was replaced to a new two-lane bridge. The improvements were designed to reduce safety issues for drivers and pedestrians who used the existing bridge. The new bridge will also allow easier travel for emergency vehicles.We completed PS&E documents and bid phase services for a replacement bridge using TxDOT criteria. Design included sidewalk for future sidewalk extensions to the adjacent high school. Services included roadway alignment; preparing construction documents; completing land surveys; geotechnical investigations; pavement design; TCP; hydrologic, hydraulic and scouring analysis; environmental assessments; and and acquiring all appropriate regulatory permits and clearances. We monitored project cost and applied cost recovery methodologies such as value engineering; and attended and assisted the county staff with public meetings.Our engineers also provided utility coordination including communication with ATMOS Energy, Austin Utility, Austin Energy, Koch Pipeline and LCRA. We also coordinated with Manor Elementary School to ensure school access for the project.

The project was expedited to be shovel ready for available funding three months earlier than schedule dictated.

Services Provided

Project Management

Structural Engineering

Roadway Engineering

Value Engineering

 

 

See More of Our Work

  • Engineering San Antonio

    Fire Station No. 50

    The design and construction of a new 11,600 sq.ft. fire station with LEED Silver Certification.

  • Engineering San Antonio

    Structural Municipal Projects

    UNINTECH provided professional structural engineering services for various municipal projects for the City of McAllen. We received work orders on these projects.

  • Engineering San Antonio

    Texas A&M University – San Antonio

    This is the new campus for Texas A&M System for Texas A&M University-San Antonio. The campus is located south of Southwest Loop 410 between Zarzamora and Pleasanton roads.

  • Engineering San Antonio

    Old Highway 20 Bridge 155

    UNINTECH was the prime consultant for this project, which purpose was to improve the existing Bridge 155. The existing one-lane bridge structure spans Gilleland Creek Tributary with an overall bridge length of 140 ft., was replaced to a new two-lane bridge.

  • Engineering San Antonio

    Churchill High School JROTC Building

    UNINTECH provided preliminary conceptual design, final design of the one-story JROTC building which is comprised of a foundation pan-joist slab on concrete piers, concrete column-steel beam structural system supporting a metal roof deck on steel joists and concrete masonry walls.